Home » Company » PRESS RELEASE: HDR | Hurley Palmer Flatt has been appointed on Marylebone Square, a £106m mixed-use scheme by Concord London

PRESS RELEASE: HDR | Hurley Palmer Flatt has been appointed on Marylebone Square, a £106m mixed-use scheme by Concord London

15/12/2020

 

Leading independent multidisciplinary engineering consultancy HDR | Hurley Palmer Flatt is delighted to be part of the principal team delivering a £106m mixed-use scheme in Marylebone Square, Central London, an incredible mansion block style development in London’s W1.

HDR | Hurley Palmer Flatt has been heavily involved in the scheme, from assisting in achieving planning consent, to then carrying out the detailed design. The company’s appointment included MEP Services, Vertical Transportation, IT/AV, Fire Engineering, Energy and Sustainability.

The exceptional site totals 0.75 acres and is the only new build whole city-block development opportunity in Marylebone, W1. The development comprises residential apartments, a gym, shops, and a new, dedicated space for the much-loved Farmers’ Market by the design of a large double-height hall, ‘Marylebone Hall’.

The mansion block building is reminiscent of a classic style with an elegant modern twist, blending with ease into its historic surroundings where distinguishable red-brick Georgian architecture is well-maintained.

Surrounding the external layer of the building is cast metal balustrading and lantern frieze detailing, with bespoke ceramic cladding consisting of a variety of glazes across the levels.

Located in the heart of the city, the development has great access to enjoy the best that London has to offer from the minute you leave your apartment, but for when you want to escape the hustle and bustle of the city, the private, central courtyard provides a calming, relaxing space to come home to with its airy atrium garden right on your doorstep.

Marylebone Square is a perfect fusion of old and new, sensitively paying tribute to the rich history of Central London with its stunning architecture, while incorporating all the features of state-of-the-art contemporary living.

To this date, almost a third of the apartments have already been sold, and the project is looking to reach completion during summer 2023.

The Principal Team on the scheme are:

Developers: Concord London

Contractor: Kier Construction

Architect: Simon Bowden Architects

Structural Engineer: Alan Baxter

Cost Consultant: Gardiner and Theobald

– ENDS –

About HDR | Hurley Palmer Flatt Group

HDR | Hurley Palmer Flatt Group is a leading independent multidisciplinary engineering consultancy, providing solutions for the built environment. HDR | Hurley Palmer Flatt Group comprises:

  • HDR | Hurley Palmer Flatt
  • HDR | Andrew Reid
  • HDR | Bradbrook Consulting
  • HDR | Concentre Consulting

In 2019, Hurley Palmer Flatt Group joined HDR, whose core businesses encompass; Transport, Water, Resources, Defence, Architecture and Building Services Engineering. Together the two firms represent more than 10,000 employees in over 200 locations around the world.

Established in 1917, HDR, and 1968, Hurley Palmer Flatt, are trusted advisors delivering engineering solutions for clients worldwide. It provides multidisciplinary consultancy from its offices in Australia, the UK, Dubai, India, Singapore, and the US. It has a commitment to innovation, precision, quality, client service and delivery.

MENU